by admin | Sep 30, 2020 | Chronicles
Problem Statement: An electrical power distribution company laid an underground cable to transfer 40MW power from substation to a load centre which was few kilometres away. After charging the cable, the cable performed as intended for 4 hours and then tripped due to...
by admin | Sep 25, 2020 | Chronicles
Overdesign in Electrical Installations When it comes to designing electrical installations, overdesign can be a serious problem that leads to increased costs, wasted resources, and reduced efficiency. In this blog post, we’ll define what overdesign means and why...